Development of phase 13 of South Pars

arco
June 22,2021
2039 views
  • customer
    :

    south pars

  • project manager
    :

    south pars manager

  • Executive project
    :

    Phase 13 development

  • start date
    :

    ۱۳۷۹/۱۱/۳۰

  • Project budget
    :

    ۱۰۰,۰۰۰,۰۰۰ tomen

  • end date
    :

    ۱۳۸۶/۱۲/۳۰

The contract for the development of phase 13 of the South Pars gas field has been concluded between “Pars Oil and Gas Company” as the employer and a consortium consisting of Iranian Petro Sustainable Companies, Mapna and Sadra. Mapna’s scope of work in this project includes the construction of utility and processing units, which includes the following:

Unit (106): Gas compression package
Unit (108): Sulfur recycling and granulation
Unit (111): Propane refrigeration
Unit (120): Emergency power generation and distribution system
Unit (121): Production and distribution of steam
Unit (123): Supply and distribution of service air and instrumentation
Unit (124): Nitrogen production and storage
Unit (126): Seawater desalination
Unit (127): Damin water production
Unit (128): Drinking water supply
Unit (129): Water and wastewater treatment
Unit (130): Fire water supply
Unit (131): Diesel system
Unit (132): Cooling water
Unit (144): Solidification and storage of sulfur
Unit (146): Chemicals and Propane
Unit (160): Communication pipe lines
Unit (163): Fire building

In this case, it can be hoped that all the difficulties in presenting solutions and difficult typing conditions will end and the required time, including typing the main achievements and answering the continuous questions of the existing world of design, will be used basically.

South Pars Gas Development Project Phase 13 is the most Iranian phase of South Pars, which began in 2010 and will be fully operational by the end of 1397.
With the launch of Phase 13 of South Pars, the supply of gas required by the country from South Pars gas refineries will increase from 70 to 85%.

Categories:

south Pars

Leave a Reply

Related Projects

Related Projects



Follow us in cyberspace:

A construction company is diverse and consists of teams of people who are proven in their industries. Everyone works to design, build, transport, operate, and maintain projects throughout the United States. But we believe that projects are more than concrete and steel.

Contact us

All rights reserved for Petroco sanat Company

Website design and SEO by Themsah Template Design Team

free consultation
  • on phone consultancy

    (During business hours)

  • WhatsApp Consulting
  • Submit a consultation request