• فارسی
  • English

0900000000

To contact us

Categories

Last Articles

    Sorry, no posts matched your criteria.

Last Projects

Get advice

Click the edit button to change this text.

021000000000

Follow our company's Instagram page

Development of South Pars gas phases

arco
June 22,2021
2094 views
  • customer
    :

    south pars

  • project manager
    :

    south pars manager

  • Executive project
    :

    Development of South Pars phases

  • start date
    :

    ۱۳۹۴/۱۱/۳۰

  • project budget
    :

    ۱۰۰,۰۰۰,۰۰۰ tomen

  • end date
    :

    ۱۳۹۶/۱۲/۳۰

The contract for the development of phases 15 and 16 of South Pars has been concluded between Aria Naft Shahab Company as the employer and a consortium consisting of Mapna. The goal of the final development of phases 15 and 16 of South Pars is to produce 50 million cubic meters of natural gas per day, 80,000 barrels of gas condensate, 400 tons of sulfur, and more than one million tons of liquefied natural gas and one million tons of ethane per year to feed petrochemicals. Mapna’s scope of work in this project includes the construction of utility and processing units, which includes the following:

Unit (120): Production and distribution of refinery electricity
Unit (121): Production and distribution of steam
Unit (122): Fuel system
Unit (123): Production of compressed air
Unit (124): Nitrogen production
Unit (125): Sea water storage
Unit (126): Seawater desalination
Unit (127): Damin water production
Unit (128): Production of drinking water
Unit (129): Collection and treatment of wastewater
Unit (130): Fire water supply
Unit (131): Fuel and emergency power supply
Unit (132): Cooling water

In this case, it can be hoped that all the difficulties in presenting solutions and difficult typing conditions will end and the required time, including typing the main achievements and answering the continuous questions of the existing world of design, will be used basically.

The contract for the development of phases 15 and 16 of South Pars has been concluded between Aria Naft Shahab Company as the employer and a consortium consisting of Mapna. The goal of the final development of Phases 15 and 16 of South Pars is to produce 50 million cubic meters of natural gas per day, 80,000 barrels of gas condensate, 400 tons of sulfur, and more than one million tons of liquefied natural gas and one million tons of ethane per year to feed petrochemicals. Mapna’s scope of work in this project includes the construction of utility and processing units

Categories:

south Pars

Leave a Reply

Related Projects

Related Projects



Follow us in cyberspace:

A construction company is diverse and consists of teams of people who are proven in their industries. Everyone works to design, build, transport, operate, and maintain projects throughout the United States. But we believe that projects are more than concrete and steel.

Contact us

All rights reserved for Petroco sanat Company

Website design and SEO by Themsah Template Design Team

free consultation
  • on phone consultancy

    (During business hours)

  • WhatsApp Consulting
  • Submit a consultation request